华为N68E 机柜 华为网络机柜

Determining the Installation Position of the Cabinet 确定机柜安装位置
|
|
① Attach the plumbline to the cabling rack that is vertical to
the front of the cabinet.Use the marker to mark the point of the plumb on the ground. 将铅垂仪吸附在待安装机柜正面垂直上方的走线架上,用 记号笔记下铅垂落在地面上的点。 ② Follow the same procedure to mark the second point, and draw the baseline by using the powder marker. 按照同样方法记下第二点,用粉斗画出基准线。 △ The method for positioning the cabinet described in this document is ony for reference.Folow the engineering drawing to position the cabinet in the actual installation. 资料中定位机柜的方法仅供参考,实际机柜安装位置以 工程施工图为准。 |
|
3确定 钻 孔g位置Positions of the Drill Holes
安 装 膨 胀 螺 栓
Unit:mm
单 位 :mm
① Fasten the expansion bolt clockwise until the
DM12×80 胀螺栓
Φ16sring wa堡
早 washer
Exansiom智一
55-60 胀音导尚槽
40ton hoe
613 将划线模板放在规划好的l位置as planned.
② M 铠号髦笔在水泥地记下+乳lation holes on the concrete flo.


Imultiple cabinats are regquired,t is recommended that you installone cabinet roperly before you mark the instalation !如果安装多个机柜,推荐单个机柜安装完成后再为相邻机柜划线。
marking-offtemplatets are at least 600mm apart.r than thre cabinets at a time.
若需连续钻孔,则连续划线、钻孔,安装的机柜数量不超过3台,确保相邻的两个划线模板中心线距离为600mm。
模板的半圆形缺口指示机柜的正前mircular gap indicates the front of the cabinet.
划好线后nR 校fr 位ce lines,check the hole positions with a ruler.
逆时针拧下螺栓,取下弹垫和平垫。
nd ot tetadodanesdetemine positin of he suppots base n the constucion enginering deawings
如 果 没 有 划 线 模 板 请 根 据 施 工 平 面 图 及 安 装 孔 位 图 确 定 支 架 安 装 位 置 。
Installing Cabinets 安装机柜


Removing the Packing Accessories and the Cabinet Doors
拆除包装附件和机柜门
① Remove the four wooden packing
accessories from the right and left of the rack respectively.
拆除机架左右各4个木制包装附件。
② Pull down the spring pin at the upper part of the front and rear doors
拉下前后门上端的弹簧销。
Remove the front and rear doors. 取 下 前 后 门 。
The procedure for removing a double swing door is the same as that for removing a
in
le门
w拆ing门
o
r与.单开门相同。
妥 要 保

Fit the spring washer,flat washer and insulation tube on


平 , 井 与
ift胀o
e母s预id
f。the cabinet and insert the insuation plate